The Special Adviser to President Bola Tinubu on Media and Communications, Sunday Dare, has criticized the timing of roadwork on the Lagos-Ibadan Expressway. He spent over five hours in traffic while heading to Ibadan, Oyo State.
Dare said the long traffic jam left thousands of commuters stuck. Many were forced to leave their cars and trek to their destinations.
He shared his frustration in a Facebook post on Wednesday night. He was unhappy about construction happening at a busy exit point during peak traffic hours.
Dare was on his way to Ibadan for the All Progressives Congress presidential rally set for Saturday. He mentioned he had several radio and television appearances lined up.
He questioned the Chinese contractor's decision to work during the busiest times instead of at night when traffic is lighter.
He wrote, "Tonight, Lagos-Ibadan Expressway. I have been in a traffic gridlock for over five hours trying to get out of Lagos to Ibadan for multiple radio and television appearances ahead of the APC Presidential Rally coming up on Saturday in Ibadan.
“It beats me why a Chinese Contractor would choose the busiest hours of vehicular traffic to construct the bridge and road around this exit point. Stranded cars, thousands of people trekking to get home.
“What happened to doing construction work during the obituary hours when traffic is lean? This is unnecessary pain. It needs to be corrected."
The traffic jam started when construction resumed on a pedestrian bridge in the Aseese area of the expressway. This work disrupted vehicles in both directions on Wednesday.
PUNCH Metro reported that the congestion stretched from the Redemption Camp area to Aseese bus stop for drivers heading to Lagos. Those going to Ogun State were stuck from the Long Bridge area to Aseese.
A PUNCH correspondent who took a commercial vehicle from Ibadan at around 11 am arrived in Magboro, Ogun State, at about 5:30 pm. Another driver spent eight hours traveling from Mowe to Magboro.
The heavy traffic forced many commuters to leave their cars and walk several kilometers. Commercial motorcyclists took advantage of the situation to raise their fares.
In September, people on the expressway faced gridlock for over 14 hours due to a multiple-vehicle crash near Kara Bridge. This added to ongoing repair work in the area.
The Ogun State Traffic Compliance and Enforcement Agency said the latest traffic diversion would last four days, from Wednesday, November 18, to Sunday, November 22.
The agency's spokesperson, Babatunde Akinbiyi, explained that the Federal Ministry of Works and CBC Construction Company were behind the temporary diversion to allow for the pedestrian bridge installation.
The agency stated that the Traffic Compliance and Enforcement Agency, along with the Federal Road Safety Corps, would send personnel to the affected area to manage traffic and reduce delays.








Drop your comment
No comments yet — be the first to drop the gist 👇